Commercial LED Retrofit Planning Guide for Building Owners and Contractors

Office ceiling during an LED retrofit with new panels and a step ladder

Plan a commercial LED retrofit in this order: audit what you have, decide between retrofit kits or tubes and new fixtures, choose controls, split the work into phases, then get a fixture schedule quoted with a photometric layout. A good audit up front prevents wrong orders, change orders and schedule delays.

What should you audit before an LED retrofit?

Walk the whole building and record what is there. The audit is the basis for every quote, so be specific.

  • Fixture count in each area, and the fixture type (troffer, strip, high bay, wall pack, pot light).
  • Lamp type and count per fixture, such as T8 or T12 tubes, metal halide or HID.
  • Supply voltage at each area, for example 120V, 277V or 347V.
  • Ceiling type and mounting height (drop ceiling, open structure, exposed deck).
  • Existing controls: switches, dimmers, occupancy sensors, photocells.
  • Conditions: damp, dusty, cold or washdown areas that need a rated fixture.

Photos of a typical fixture in each area and a simple floor plan help a lot. Note any emergency lighting while you are there.

Should you use retrofit kits and tubes or new fixtures?

It depends on the condition of the existing fixtures, the access and the budget. Our fluorescent to LED retrofit guide compares tube types and new fixtures in more detail.

Option Works best when Watch for
LED tubes in existing fixtures Housings and lampholders are in good shape and access is easy Ballast compatibility, and the old housing stays in place
Retrofit kits Housings are sound but you want to replace the lighting engine Fit to the existing housing and labour per fixture
New fixtures Housings are old, damaged or poorly located, or the layout needs to change Higher material cost, but a clean, listed, complete product

For offices and drop ceilings, new LED panel lights are a common replacement for fluorescent troffers. In industrial spaces, LED high bay lights replace metal halide and fluorescent high bays.

How do controls fit into a retrofit?

New fixtures are the easiest time to add controls, since you are already on the ladder. Think about where each type makes sense.

  • Occupancy or vacancy sensors in storage rooms, corridors, washrooms and warehouse aisles.
  • Photocells on exterior lighting.
  • Dimming where tasks or the time of day vary, with drivers and controls that match.

See our motion sensors guide for how occupancy control works. Confirm what the fixtures accept, such as 0-10V dimming or a built-in sensor, before you choose a control scheme.

Why should you phase a retrofit?

A phased approach spreads cost, limits disruption and lets you learn from the first area before you commit to the rest. A typical sequence looks like this:

  1. Start with the areas that run the most hours or have the worst existing lighting.
  2. Install a small pilot area and check light levels, glare and controls.
  3. Roll out to the remaining areas in groups, keeping the same fixture models for easy maintenance.
  4. Do exterior and emergency lighting as separate packages so you can match ratings and code requirements.

Ordering by phase also lets us hold stock and plan delivery. We have partner warehouses in Vancouver, Toronto and Montreal as well as our Edmonton warehouse, and in-stock items usually dispatch in 1-2 business days.

How do you get a fixture schedule quoted?

Send us your audit and we will turn it into a fixture schedule: a list of each fixture type, quantity, location, mounting and recommended replacement. A schedule is easier to price accurately than a general request.

  • Include counts, existing types, voltages and ceiling or mounting heights.
  • Say which areas are wet, dusty, cold or classified.
  • Tell us your timeline and whether the work is phased.

See our commercial lighting in Edmonton page for how we support trade and building owner projects. Net 30 terms are available subject to approval.

Do you need a photometric layout for a retrofit?

It is worth having one for any space where light levels matter, such as warehouses, parking lots and large open areas. A layout shows how many fixtures you need, where they go and what light levels to expect, so you do not over- or under-buy.

We provide free DIALux and AGi32 photometric layouts for Technilight fixtures. Learn more on our free photometric simulation page.

How do you dispose of old lamps and fixtures?

Old fluorescent tubes and some HID lamps contain materials that may need special handling, and old ballasts may too. Follow your local and provincial rules for disposal and recycling. Ask your waste or recycling provider, or your municipality, where old lamps can be taken, and keep records if your client needs them.

What is a good retrofit planning checklist?

  • Fixture audit completed with counts, types, voltages and heights.
  • Photos and floor plan collected.
  • Decision made on tubes, kits or new fixtures for each area.
  • Controls chosen and matched to the fixtures.
  • Phases and sequence agreed.
  • Fixture schedule and quote requested.
  • Photometric layout requested where needed.
  • Code and permit questions confirmed with your inspector.
  • Disposal and recycling arranged.

Frequently asked questions

What information do I need to get an LED retrofit quote?

Fixture counts and types, existing lamp types, supply voltage, ceiling or mounting heights, and any special conditions such as wet or dusty areas. Photos help.

Is it better to replace the fixtures or just the lamps?

If the housings are in good shape, LED tubes or kits can work. If they are old, damaged or badly placed, new fixtures usually give a cleaner result. Compare both for each area.

Can I retrofit one area at a time?

Yes. Phasing is common. Start with a pilot area, check the result, then continue, using the same fixture models throughout.

Do you offer photometric layouts?

We provide free DIALux and AGi32 layouts for Technilight fixtures. Send us the plan, ceiling heights and target light levels.

How should I dispose of old fluorescent tubes?

Follow your local and provincial rules for lamp and ballast disposal and recycling. Ask your municipality or recycling provider where to take them.

Planning a retrofit? Contact the LitesGo team or call (587) 701-5969. We are at 4914 89 St NW, Edmonton, AB T6E 5K1, and in-stock items usually dispatch in 1-2 business days anywhere in Canada.